• About
    • About Us
    • Our History
    • Our Team
    • Community
  • Services
  • Projects
  • News
  • Contact Us
  • About Us
  • Contact Us
  • Logout
  • Opening Hours Mon to Fri 7am-5pm
  • Call Us (03) 5595 1078
GreenCon Logo
  • About
    • About Us
    • Our History
    • Our Team
    • Community
  • Services
  • Projects
  • News
  • Contact Us
Request an Estimate
  • Homepage
  • About
    • About Us
    • Our History
    • Our Team
  • Services
  • Projects
  • News
  • Contact Us
  • Request an estimate

Projects

Commercial/Industrial

Regen MRU Foundations

Project description

Beach Energy is a major energy supplier which operates the Otway Gas Plant in Waarre, SouthWest Victoria.

GreenCon is a pre-qualified contractor to Beach Energy, supplying concreting and construction services on an as-needs basis. It is essential for any supplier to pre-qualify, given the incredibly high-risk environment of the plant. This is also a long and challenging process, which requires compliance with a multitude of conditions.

On this project, GreenCon was engaged to construct large foundations for the installation of a new Mercury Removal Unit (MRU). This was a complicated project, requiring extremely cautious excavation as there were underground services surrounding the excavation area. We experienced continuous issues with water ingress and soil instability.

We delivered in constructing the MRU Vessel Foundation, the Molecular Sieve Foundation, Equipment Area Slab, and Multiple Pipe support foundations within tolerance, schedule and budget.

Key points

  • Large foundation
  • Complicated excavation
  • Precise tolerances
  • High Quality Assurance Standards
  • Work within a Major Hazard Facility

 

Project duration: three months

Laying the foundation formwork for pipe support framework. Includes casting plates and bold templates Mercury Removal Unit foundation prior to backfilling with stabilised sand Foundations being backfilled in stabilised sand Aerial view of pouring the equipment area slab Shot of the completed mercury removal unit project
Back to Projects

More Projects

Camperdown Compost

Camperdown Compost

Project description Camperdown Compost has established itself as the premier supplier of on-farm composting solutions in Victoria's Western District for…

Request an estimate

Contact Us Today

Our Credentials

At GreenCon, we are serious about all things concrete. We've been in the industry since 1964, and employ some of the best concreters you could hope to set eyes on. When you contract GreenCon you know we'll get your job done quickly, efficiently and professionally.

GreenCon wishes to acknowledge the Traditional Custodians of the land on which we work and gather right across this nation. We pay our respects to Elders past and present, and recognise their ongoing connection to this beautiful country, with knowledge and stories that have been handed down since time immemorial.

Contact Us

info@greencon.com.au

(03) 5595 1078


Head Office

1 Station Street
Cobden VIC
Australia

Warrnambool Office

5 Jenkins St
Warrnambool VIC
Australia

All rights reserved © 2026 GreenCon Concrete & Construction. ABN 18508246793

Privacy Policy

Terms of Use

Modern Slavery Statement

Sitemap

Built by